zozen boiler
HomeBoiler tagsauxiliary equipment

“auxiliary equipment”- related faq

  • What are the safety accessories of the thermal oil heater? 2022-01-28
    Safety accessories of the thermal oil heater include safety valves and bursting discs, stop valves, pressure gauges, etc.   The basic configuration of low nitrogen thermal oil heater system includes the following main parts: 1. Combustion system: including furnace, burner, ignition device, etc. 2. Oil circulation system: circulating oil pump, oil injection pump, storage tank, expansion tank, etc. 3. Control system: complete with boiler control box. 4. Air-smoke system: refers to the s...
  • What is the classification of common boiler water? 2022-01-21
    Raw water: refers to water that has not been disinfected and filtered, such as river water, stream water, well water, reservoir water, etc. Feed water: refers to the chemical water delivered from deaerator to boiler by feed pump. Make-up water: Make-up water for boiler is to make up the lost part or externally supplied part after completing a steam-water cycle, so that the boiler can always operate at a safe water level. Recycling condensing water: When the heat energy of steam or hot water i...
  • Why is the boiler not starting up? 2022-01-21
    Water and electricity are not available; Circulating water pump is not running; Water flow switch is different; The 200V 380V power supply is not connected; The valve is not opened; The controller switch is set incorrectly; There is a problem with the controller circuit; There is something wrong with the programmer; Leak detection has not been checked; Air pressure switch impassability; Air pressure switch 1-3 impassability; Overtemperature protection and combustion heat protection;...
  • What is the function of boiler drum? 2022-01-21
    The boiler drum is connected with downcomer and water wall to form a natural circulation loop. At the same time, the boiler drum receives the feed water from the economizer and delivers saturated steam to the superheater. Therefore, the boiler drum is the connecting hub of the three processes of heating, evaporation and overheating in the boiler.
  • What's the price of an 80-ton gas-fired steam boiler? 2022-01-21
    When choosing the 80-ton gas-fired steam boiler, the price determines the customer's upfront investment cost, so it is as important as the quality. However, the price is not determined by a single factor, it is related to many aspects, the price of 80-ton gas-fired steam boiler will be different with different choices. Let’s talk about what are the main factors that affect the 80-ton gas-fired steam boiler?
  • What standard should low-pressure boiler furnace drying meet? 2022-01-14
    (1) The mortar in the outer brick joints of the furnace wall can be ground into powder by hand without bonding, which indicates the mortar has been dried. (2) Use a thermometer to insert 100mm from the outer wall. When the temperature reaches 50℃, it can last for 48h, and the outer wall temperature should be uniform.
  • What is the process and operation of low-pressure boiler furnace drying? 2022-01-14
    (1) The furnace drying time depends on the shape, structure and humidity of the furnace. It takes 4 ~ 7 days for small low-pressure boilers and 10 ~ 15 days for heavy furnace walls. (2) First, bake with wood, on the ash hopper of the room furnace and the grate of the chain furnace, use small fire for natural ventilation within 2 ~ 3 hours. When the temperature of combustion chamber rises, the ventilation capacity will be improved, and the flue damper can be turned down a little. It is best to k...
  • What are the conditions and preparations for low-pressure boiler furnace drying? 2022-01-14
    (1) The boiler and all auxiliary equipment are installed, and all tests such as ball passing test, hydrostatic test and air tightness test are qualified. (2) All rotating devices, feed water pumps, condensate pumps, salt solution pumps, blowers and induced draft fans for coal conveying, combustion and ash removal are qualified for trial operation. (3) The fuel and water supply are guaranteed, the steam, water and flue gas piping system are normal, and the connection unrelated to the boiler to ...
1...28 29 30 31 32 33 34 35...80