Research Center for Clean Energy and Power, Jiangsu and CAS is a provincial scientific research institution approved by the Office of Organization Establishment Commission of Jiangsu Province. It is responsible for the part construction of high-efficiency and low-carbon gas-fired steam turbine testing apparatus assigned to Jiangsu Province, which is a national key scientific infrastructure project whose impersonal entity is Institute of Engineering Thermophysics, CAS. In the construction, several small test beds required sufficient and stable steam support, so the Center purchased a set of high-efficiency and stable WNS series steam boiler from ZOZEN Boiler.
In order to promote the Blue Sky Protection Campaign, Xing County in Shanxi Province has actively implemented the heating project with a focus on promoting the coal-to-gas heating protect in the rural areas of Xing County. This time, ZOZEN Boiler and Xing County Wenxin Thermal Power Co., Ltd. successfully reached the cooperation on the clean and high-efficiency WNS series gas-fired hot water boiler, which strongly promoted the clean heating business in Xing County, improved the local environmental and air quality, and increased the happiness index of the local people.
In the production process of aerated concrete products, the high-temperature steam curing of the aerated concrete body is an important process which can directly affect the product yield. The appropriate temperature for the autoclaved curing of aerated concrete is above 175℃, and the heating equipment includes the autoclave, precuring kiln and so on, which requires the efficient and stable steam boiler to provide heat energy. Anhui Guangrun New Building Materials Co., Ltd. is an enterprise specialized in the production of lightweight autoclaved aerated concrete (ALC) products. In order to improve the production capacity and optimize the production efficiency, Guangrun New Building Materials ordered a set of WNS series three-pass gas-fired steam boiler from ZOZEN Boiler, as the heating equipment in the production of aerated concrete products.
With the continuous development of the building materials industry and the increasing environmental awareness of the whole society, many brick factories in China have conducted the production transition. Ledong Changsheng Standard Eco-friendly Brick Co., Ltd., founded in 2011, has grasped the opportunity to engage in the production and sales of new wall materials, eco-friendly bricks, which earns considerable profits for the company. However, the stable operation of the eco-friendly brick production line depends on the steam supply provided by the industrial boiler, and a set of energy-saving and high-efficiency steam boiler can directly affect the quality of eco-friendly bricks and the economic benefits of the enterprise. Therefore, after a specific investigation on the domestic industrial boiler market, Ledong Changsheng Standard Eco-friendly Brick finally chose ZOZEN Boiler as the boiler equipment supplier.
ZOZEN heating boilers have the characteristics of high efficiency, high durability, energy conservation and environment protection, ensuring the smooth heat supply for all walks of life. Shenyang Space Xinle Co., Ltd., established in 2000, mainly manages the research, development and manufacture of spaceflight products. As the problem of environmental pollution is becoming more and more serious, the national government has strengthened environmental governance, energy co...
Steam boilers are typically indispensable pieces of equipment in the production, providing enough steam for filtration, sterilization, aseptic filling and other processes. Nongfu Spring is one of China’s leading bottled water supplier, producing natural drinking waters, vegetable and fruit juices, functional beverages and other natural soft drinks. Nowadays, large scale production has been carried out in eight high-quality water sources. Nongfu Spring has always worked hard to be conscientious in taking care of the environment. This time, they decided to order several gas-fired boilers for green development. ZOZEN is preferred by Nongfu Spring by their rich experience and systematic solutions, helping provide two sets of 4 tph WNS series gas-fired fire tube boilers. Large corrugated furnace is adopted by these boilers for fuels to be fully burned and works with thread smoke tube, which makes thermal efficiency reach above 98%. Furthermore, ultra-low NOx emissions are able to be r
Qinghai Salt Lake Hainer Chemical Co., Ltd. is a wholly-owned subsidiary of Qinghai Salt Lake Industry Co., Ltd., and it is the first domestic company with a full set of advanced production equipment for PVC production technology and downstream product development capabilities. Qinghai Salt Lake Chemicals requires large quantities of steam in the production of PVC, which consumes a lot of fuel costs each year. The person in charge learned through multiple parties and contacted the ZOZEN boiler and purchased two 35T/h SHX series circulating fluidized bed steam boilers at ZOZEN. The boiler has an evaporation capacity of 10~75T/h, a steam pressure of 1.25~2.5MPa, a steam temperature of 194~225°C, a wide fuel adaptability and a high combustion efficiency. It not only can help Qinghai Salt Lake Chemical Company reduce the fuel consumption of several million yuan, but also significantly reduce the annual electricity consumption, its energy saving effect is very significant.
The butyl rubber meridian tube has excellent airtightness, excellent heat resistance and aging resistance, and is suitable for use in automobiles that travel at a high speed. Jiangxi Taiming specializes in the production of butyl rubber radial tires, with an annual production capacity of 2 million high-quality butyl rubber meridian inner tubes. At present, the evaporation of steam boilers in most existing tire factories is generally between 4 and 35 t, and the proportion of steam in the power costs of tire production is also high. In response to the production capacity of Taiming in Jiangxi, ZOZEN recommended a 6-ton SZL packaged coal-fired steam boiler. This series of boilers are fully assembled and shipped from the factory. Water-cooled walls are arranged around the front of the boiler body, the upper part is connected with the drum, and the lower part is connected with the header to form a combustion chamber to absorb the radiant heat of the furnace. The rear end is densely arranged