1) The entire plant may be purchased as a complete package, only needing securing to basic foundations, and connecting to water, electricity, fuel and steam systems before commissioning. This means that installation costs are minimised.
2) This package arrangement also means that it is simple to relocate a packaged shell boiler.
3) A shell boiler contains a substantial amount of water at saturation temperature, and hence has a substantial amount of stored energy which can be called upon to cope with short term, rapidly applied loads.
*This can also be a disadvantage in that when the energy in the stored water is used, it may take some time before the reserve is built up again.
4)The construction of a shell boiler is generally straight forward, which means that maintenance is simple.
5)Shell boilers often have one furnace tube and burner. This means that control systems are fairly simple.
Although shell boilers may be designed and built to operate up to 27 bar, the majority operat
For a boiler to operate stably and efficiently, all links must be properly coordinated without making mistakes. For gas-fired boilers, it is necessary not only to have softened water treatment facilities, but also to carry out regular sewage discharge, which cannot be ignored.
The automatic boiler water level controller is mainly composed of hardware and software parts to complete the functions of the control system. The hardware part is mainly composed of the water level detection circuit, drive circuit, water level indication circuit, pressure automatic control simulation, manual control, etc. The software part is mainly composed of the programs written in assembly language.
According to the power of water or steam circulation, boilers can be divided into natural circulation boilers, forced circulation boilers, once-through boilers and combined circulation boilers.
Whether the water quality in the gas-fired boiler reaches the required standards is directly related to the safety, performance and service life of boiler. The water must be treated before the boiler operation. However, what are the water quality standards for the gas-fired boiler?
1) Set up the air preheater. One of the most effective measures to improve the thermal efficiency of thermal oil heater is to use an air preheater for heat recovery. 2) Use waste heat boiler for heat recovery. The waste heat boiler uses the waste heat in the flue gas exhausted from the thermal oil heater to heat water or generate steam.
There are many skill indicators involved in the operation of oil-fired boiler, some of which are variables. We must master the relationship between variables and working effect of oil-fired boiler to realize better regulation.
Industrial boilers will produce wastes that needs to be treated during the use process, which is what we mentioned of boiler blowdown. What are the methods for boiler blowdown?
1. Regular blowdown
1) The time interval and quantity of discharge depend on the test results of boiler water. It usually do not exceed 5% of the water supply.
2) When the regular blowdown is being made under high load of the boiler, the blowdown of the water-cooled wall header is generally not required to avoid affecting the normal water circulation of the water-cooled wall and forming a tube explosion incident.
2. Continuous blowdown
The amount of blowdown shall be determined according to the test results of the boiler water, and shall be completed by adjusting the needle-shaped angle of the blowdown tube.