What are the discharge methods for industrial boilers?
Industrial boilers will produce wastes that needs to be treated during the use process, which is what we mentioned of boiler blowdown. What are the methods for boiler blowdown?
1. Regularblowdown
1) The time interval and quantity of discharge depend on the test results of boiler water. It usually do not exceed 5% of the water supply.
2) When the regular blowdown is being made under high load of the boiler, the blowdown of the water-cooled wall header is generally not required to avoid affecting the normal water circulation of the water-cooled wall and forming a tube explosion incident.
2. Continuous blowdown
The amount of blowdown shall be determined according to the test results of the boiler water, and shall be completed by adjusting the needle-shaped angle of the blowdown tube. The sewage can be flowed into the pressure expansion tank so that the secondary steam generated due to the pressure drop can be reused meanwhile the wasted water is discharged from the expansion tank, in order to improve the thermal efficiency.
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
SZS series gas-fired (oil-fired) hot water boilerLive Chat7-116 MW1-1.6 MPa
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
From May 6 to 7, 2026, ZOZEN Boiler will participate in Palmex Indonesia 2026 at Jakarta International Expo (JIEXPO), Indonesia. ZOZEN Boiler will welcome visitors at Booth 190 & 192. As an industry event focused on the palm oil sector in Southeast Asia, the exhibition brings together companies involved in palm oil processing, supporting energy systems, and industrial equipment, offering ZOZEN Boiler a valuable opportunity to meet customers from Indonesia and surrounding markets. ZOZEN Bo...28 Apr 2026 -
Bangladesh is one of the world’s major producers and exporters of garments and textiles. With a well-developed industrial chain covering textile, dyeing, printing, and garment manufacturing, long-term demand for industrial steam remains strong. In production processes such as dyeing, washing, drying, and finishing, steam boilers play an important role in ensuring stable heat supply. As local textile enterprises place greater emphasis on energy consumption control, fuel utilization, and ope...21 Apr 2026 -
In Pakistan, garment manufacturing and fabric processing remain important parts of industrial production. For these factories, steam is not an auxiliary utility but a core part of the production chain. Processes such as dyeing, drying, heat setting, and finishing all require a stable and continuous steam supply. Any fluctuation in steam output may affect production rhythm. Against this background, more textile companies in Pakistan are paying closer attention to fuel adaptability, operating sta...14 Apr 2026











