What are the safety precautions when operating a gas-fired boiler burner?

03 Jul 2020
  1. During the start-up process of the burner, if the burner repeatedly alarms and locks, it should be found out the reason, find the fault and eliminate it, and then press the reset button to inherit the start. Note: The continuous press of the reset button should not exceed 10 seconds.
  2. If the burner is not successful in one combustion, the natural gas boiler induced draft fan should be restarted, and the second combustion can be started after 5 minutes of ventilation.
  3. In the normal operation era, the burner close to the thermal equipment department (such as the connecting flange, etc.) will be very hot, to prevent the formation of burns. Do not place flammable materials in the vicinity to avoid causing fire.
  4. During the operation of natural gas-firedboilers, it is necessary to closely supervise the working conditions of hot water circulation pumps and natural gas-fired boiler pressures, natural gas distribution bags, pipeline valves, pressure gauges, flow meters, and water level gauges.
  5. When closing the furnace door or viewing the flame in the furnace from the furnace door, the furnace staff should wear gloves to manipulate and observe sideways.
  6. The working condition of the burner should be clean and dry, especially the flame detector (ie, the electric eye) should be clean, and the control circuit department should not be damp and low temperature; the burner should be cleaned and maintained once every shift.
  7. In the application process of the filter, it is necessary to check the filter or replace the filter element according to the fuel impurities.
  8. Check the electrical measures, mainly: whether the wire is damaged, the sheath is damaged, the screw is loose, whether the contact is superior, whether the electromechanical operation is abnormal, etc.
Related FAQs View More
Related news View More
  • Heating Solutions, Local Support: ZOZEN Boiler’s Approach to Expanding in Vietnam
    Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...
    17 Nov 2026
  • Energy Costs and Stable Steam Supply Draw Attention as ZOZEN Boiler Provides Diverse Steam Solutions for Textile Enterprises Worldwide
    From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...
    10 Nov 2026
  • ZOZEN Boiler Supports Building Materials Projects in Hubei with Steam and Thermal Oil Solutions
    IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...
    03 Nov 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity