What are the matters needing attention when discharging gas boiler?
For a boiler to operate stably and efficiently, all links must be properly coordinated without making mistakes. For gas-fired boilers, it is necessary not only to have softened water treatment facilities, but also to carry out regular sewage discharge, which cannot be ignored.
1) It is necessary to check the condition of the blowdown valve of the gas boiler before the blowdown. If the blowdown valve is seriously damaged (bent stem, stuck valve, serious leakage, etc.), it is not allowed to use it for blowdown.
2) Before pollutant discharge, the shift leader and neighboring furnaces need to be notified.
3) It is necessary to find out that the gas boiler under maintenance has been isolated from the sewage system before discharge.
4) It is forbidden to blow off two gas boilers at the same time.
5) The sewage discharge place and the passage leading to the sewage discharge point should have sufficient lighting, otherwise the sewage discharge is not allowed.
6) When someone is overhauling the sewage system, it is prohibited to discharge sewage.
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
SZS series gas-fired (oil-fired) hot water boilerLive Chat7-116 MW1-1.6 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026