What are the operation steps of discharging water after boiler shutdown?

26 Nov 2021

(1) Gradually reduce the boiler load until it is in a low flame state.

 

(2) Manually close the fuel supply valve, stop the combustion, purge after the program enters, until the end of the purge, stop the program such as burning heavy oil, and enter the line sweeping stage before stopping the combustion, and purge with steam or light oil pipe; Generally, steam purging is used when stopping for a long time.

 

(3) Stop air supply and close the steam valve. For boilers with superheated steam, open the steam trap of superheater outlet header for 30 ~ 50 minutes to cool down the superheater, and close the continuous drain valve at the same time. But don't use the boiler for quick cooling.

 

(4) The air pressure should not drop too fast. Before it drops to atmospheric pressure, the boiler should be monitored.

Related FAQs View More
Related news View More
  • Heating Solutions, Local Support: ZOZEN Boiler’s Approach to Expanding in Vietnam
    Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...
    17 Nov 2026
  • Energy Costs and Stable Steam Supply Draw Attention as ZOZEN Boiler Provides Diverse Steam Solutions for Textile Enterprises Worldwide
    From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...
    10 Nov 2026
  • ZOZEN Boiler Supports Building Materials Projects in Hubei with Steam and Thermal Oil Solutions
    IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...
    03 Nov 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity