What are the operation steps of discharging water after boiler shutdown?

26 Nov 2021

(1) Gradually reduce the boiler load until it is in a low flame state.

 

(2) Manually close the fuel supply valve, stop the combustion, purge after the program enters, until the end of the purge, stop the program such as burning heavy oil, and enter the line sweeping stage before stopping the combustion, and purge with steam or light oil pipe; Generally, steam purging is used when stopping for a long time.

 

(3) Stop air supply and close the steam valve. For boilers with superheated steam, open the steam trap of superheater outlet header for 30 ~ 50 minutes to cool down the superheater, and close the continuous drain valve at the same time. But don't use the boiler for quick cooling.

 

(4) The air pressure should not drop too fast. Before it drops to atmospheric pressure, the boiler should be monitored.

Related FAQs View More
Related news View More
  • ZOZEN Boiler 2026 Sales Conference Successfully Held
    Spring brings new life and new beginnings. On February 25, 2026, the ninth day of the first lunar month—a date symbolizing longevity and good fortune—the "2026 ZOZEN Boiler Sales Conference & 2025 Annual Sales Awards Ceremony" was successfully held at the ZOZEN headquarters by Taihu Lake, Wuxi. The conference was themed "United We Start: Upholding Integrity with Innovation, Marching Towards Intelligence." General Manager Mr. Zhang Guoping, department heads, and the entire domest...
    25 Feb 2026
  • Guarding the Flavor of the "Red Industry": ZOZEN Gas Steam Boiler Solves Pain Points in Tomato Processing
    Every August to September, Xinjiang welcomes a grand feast of red harvest. As a globally significant production base for tomato paste, tomato products here are renowned for their high lycopene content. However, for tomato processing enterprises, this is not just a harvest season, but a race against time. The tomato maturity period is concentrated, and fresh fruit is difficult to store, leaving a processing window of only 45 to 55 days. Once equipment downtime occurs, mountains of fresh fruit wil...
    17 Feb 2026
  • Another Success in Indonesia: ZOZEN Boiler Boosts Production and Efficiency for Palm Oil Mill
    On the edge of the tropical jungles of Sumatra, Indonesia, the hum of machinery blends with the scent of palm fruit, painting a busy picture of the local palm oil processing industry. As a key global production base, Indonesian oil processing enterprises have a high dependency on reliable thermal energy supply. Booming Oil Processing Industry in Indonesia Recently, Wuxi ZOZEN Boiler Co., Ltd. ("ZOZEN Boiler") successfully delivered and commissioned a 15 t/h SZL series coal-fired steam boiler...
    03 Feb 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity