What aspects are included in the system commissioning before the operation of oil-fired boiler?
Before the operation of oil-fired boiler, we should effectively adjust the heating system to make it conform to the actual working conditions. Moreover, what are the specific operating steps when adjusting the oil-fired boiler?
The first step is to add water to the oil-fired boiler. First open the water feeding valve, wait boiler's water level rising to the normal level, and close the water feeding valve.
It is not only the oil-fired boiler itself that need to be added water, but also the system. Open the system water feeding valve to add water, then observe the automatic exhausting conditions until the exhausting valve does not work, and finally close the water feeding valve. If the pressure of tap water does not meet the standards, a pump can be used to add water.
After the oil-fired boiler and system complete the water feeding, the low temperature operation of water pump can be set via the control box. However, before starting the pump, open all the valves except the water feeding valve. Meanwhile, open the open/close device, hydraulic tube and exhausting valve to exhaust the air and observe boiler's water level at the same time.
If the water level rises significantly, the resistance control valve should be turned down properly until the water level stops rising; if the water level drops, it indicates that the system is not be added enough water, so keep adding water to the oil-fired boiler until the water level stops dropping. After the water level of oil-fired boiler is adjusted to the normal, shut off the water pump and check whether the parts like open/close device and back-pressure valve are normal.
The checking method is also very simple to observe whether the water level of oil-fired boiler is rising. If the water level rises, it indicates the valves are not fully closed. There will be the sound of water flow when putting the ear closely on the open/close device and back-pressure valve. If there is something wrong with the open/close device, check the valve. If there is something blocked, remove it as soon as possible.
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
As the beer industry moves toward greener, more continuous, and more refined production, the steam system has become an important part of brewing operations. Recently, the cooperation case between ZOZEN Boiler and Yanjing Beer (Guilin Liquan) Co., Ltd. once again highlighted the essential role and system value of industrial boiler equipment in the food and beverage industry. Industrial Heat and Beer Brewing Are Closely Connected From a Drop of Beer, the Value of Stable Steam Becomes ClearYan...24 Jun 2026 -
Recently, ZOZEN Boiler delivered a 3-ton WNS series skid-mounted steam boiler to a stationery products manufacturer in Thailand. The customer mainly produces solid glue, crayons, oil pastels and other stationery products. During production, the customer has clear requirements for continuous and stable steam supply. Based on the customer’s process features and site conditions, ZOZEN Boiler adopted a skid-mounted delivery solution, integrating the boiler body and auxiliary equipment to suppo...16 Jun 2026 -
Brazil is an important sugarcane-producing country, with a mature sugarcane sugar industry chain and abundant bagasse resources. According to project information, Brazil produces more than 200 million tons of bagasse annually. How to convert bagasse from an agricultural by-product into a usable resource has become one of the focuses for local sugar producers. ZOZEN SZS Series Gas-Fired Steam Boiler Exported to Brazil The project supported by ZOZEN Boiler is the “CNBC500 Carbonization S...09 Jun 2026