What aspects are included in the system commissioning before the operation of oil-fired boiler?
Before the operation of oil-fired boiler, we should effectively adjust the heating system to make it conform to the actual working conditions. Moreover, what are the specific operating steps when adjusting the oil-fired boiler?
The first step is to add water to the oil-fired boiler. First open the water feeding valve, wait boiler's water level rising to the normal level, and close the water feeding valve.
It is not only the oil-fired boiler itself that need to be added water, but also the system. Open the system water feeding valve to add water, then observe the automatic exhausting conditions until the exhausting valve does not work, and finally close the water feeding valve. If the pressure of tap water does not meet the standards, a pump can be used to add water.
After the oil-fired boiler and system complete the water feeding, the low temperature operation of water pump can be set via the control box. However, before starting the pump, open all the valves except the water feeding valve. Meanwhile, open the open/close device, hydraulic tube and exhausting valve to exhaust the air and observe boiler's water level at the same time.
If the water level rises significantly, the resistance control valve should be turned down properly until the water level stops rising; if the water level drops, it indicates that the system is not be added enough water, so keep adding water to the oil-fired boiler until the water level stops dropping. After the water level of oil-fired boiler is adjusted to the normal, shut off the water pump and check whether the parts like open/close device and back-pressure valve are normal.
The checking method is also very simple to observe whether the water level of oil-fired boiler is rising. If the water level rises, it indicates the valves are not fully closed. There will be the sound of water flow when putting the ear closely on the open/close device and back-pressure valve. If there is something wrong with the open/close device, check the valve. If there is something blocked, remove it as soon as possible.
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
From May 6 to 7, 2026, ZOZEN Boiler will participate in Palmex Indonesia 2026 at Jakarta International Expo (JIEXPO), Indonesia. ZOZEN Boiler will welcome visitors at Booth 190 & 192. As an industry event focused on the palm oil sector in Southeast Asia, the exhibition brings together companies involved in palm oil processing, supporting energy systems, and industrial equipment, offering ZOZEN Boiler a valuable opportunity to meet customers from Indonesia and surrounding markets. ZOZEN Bo...28 Apr 2026 -
See You in Dhaka on April 29 | ZOZEN Boiler Confirms Participation in BTKG 2026 Bangladesh ranks among the world's major garment and textile producing and exporting countries. Its extensive textile and dyeing industry maintains a consistent, concrete demand for stable and efficient industrial heat sources. From April 29 to May 2, 2026, the Bangladesh International Textile, Knitting & Garment Industry Exhibition (BTKG 2026) will be held at the ICCB International Convention City Bashundhara i...21 Apr 2026 -
In Pakistan, garment manufacturing and fabric processing remain important parts of industrial production. For these factories, steam is not an auxiliary utility but a core part of the production chain. Processes such as dyeing, drying, heat setting, and finishing all require a stable and continuous steam supply. Any fluctuation in steam output may affect production rhythm. Against this background, more textile companies in Pakistan are paying closer attention to fuel adaptability, operating sta...14 Apr 2026