What aspects are included in the system commissioning before the operation of oil-fired boiler?
Before the operation of oil-fired boiler, we should effectively adjust the heating system to make it conform to the actual working conditions. Moreover, what are the specific operating steps when adjusting the oil-fired boiler?
The first step is to add water to the oil-fired boiler. First open the water feeding valve, wait boiler's water level rising to the normal level, and close the water feeding valve.
It is not only the oil-fired boiler itself that need to be added water, but also the system. Open the system water feeding valve to add water, then observe the automatic exhausting conditions until the exhausting valve does not work, and finally close the water feeding valve. If the pressure of tap water does not meet the standards, a pump can be used to add water.
After the oil-fired boiler and system complete the water feeding, the low temperature operation of water pump can be set via the control box. However, before starting the pump, open all the valves except the water feeding valve. Meanwhile, open the open/close device, hydraulic tube and exhausting valve to exhaust the air and observe boiler's water level at the same time.
If the water level rises significantly, the resistance control valve should be turned down properly until the water level stops rising; if the water level drops, it indicates that the system is not be added enough water, so keep adding water to the oil-fired boiler until the water level stops dropping. After the water level of oil-fired boiler is adjusted to the normal, shut off the water pump and check whether the parts like open/close device and back-pressure valve are normal.
The checking method is also very simple to observe whether the water level of oil-fired boiler is rising. If the water level rises, it indicates the valves are not fully closed. There will be the sound of water flow when putting the ear closely on the open/close device and back-pressure valve. If there is something wrong with the open/close device, check the valve. If there is something blocked, remove it as soon as possible.
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Recently, ZOZEN Boiler successfully delivered and commissioned a 2 million kcal/h gas-fired horizontal thermal oil heater system for Inner Mongolia Jiaruimi Fine Chemical Co., Ltd., providing an efficient and stable medium-to-high temperature heat source for its pesticide and fine chemical production lines. The successful implementation of this project not only marks Jiaruimi’s thermal system entering a new stage of energy saving and environmental protection, but also further demonstrates ...16 Dec 2025 -
In industrial manufacturing, the stability and efficiency of steam heating systems directly determine production continuity and economics. Recently, an Afghan paper mill successfully commissioned a ZOZEN Boiler SZL series coal-fired steam boiler with a capacity of 25 tons per hour, providing a reliable heat source for the dryer cylinders on the paper machine and for pulping. The smooth implementation of this project highlights ZOZEN Boiler’s technical adaptability and project execution cap...09 Dec 2025 -
In modern manufacturing, 6S workplace management has become an important method for enhancing shop-floor management and is being widely adopted by more and more enterprises. ZOZEN Boiler actively practices the 6S philosophy. By optimizing the workshop environment and management processes, the company has effectively improved production efficiency and product quality. ZOZEN Boiler 6S management — workshop neat and orderly Sorting and Set-in-Order: The foundation of efficient operationsI...02 Dec 2025