What is the structure and process principle of horizontal gas-fired three-pass boiler?
Industry boiler is an important thermal power device, which is widely used in factory power, building heating, people's life and other aspects, with a large demand and a wide variety. According to the different flue gas passes, gas-fired boilers are divided into two-pass and three-pass boiler structures. Here, ZOZEN Boiler focuses on the structure and process principle of the common three-pass boiler.
The first pass: after the fuel is atomized by the burner, the formed torch is filled in the full-waveform furnace liner and transmits radiant heat through the wall of the furnace liner;
The second pass: the high-temperature flue gas generated by combustion gathers in the combustion chamber and turns into the second return journey, that is, the tube bundle area of the threaded flue pipe. After convective heat exchange, the flue gas temperature gradually decreases and then reaches the front flue box, where it turns into the third return journey;
The third pass: To reduce the resistance, the third return trip is designed as a smooth tube bundle area. After heat exchange, the flue gas then enters the condensing economizer and chimney through the rear smoke box, and is finally discharged into the atmosphere.
WNS horizontal gas-fired boiler produced by ZOZEN has three passes, with a single capacity of 1-20t/h, which has the characteristics of safety, reliability, high efficiency, energy saving and environmental protection, convenient maintenance, automatic and intelligent control, etc. The thermal efficiency of the boiler is as high as 98% or more, and the low nitrogen emission of NOx below 30mg/Nm³ can be realized.
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026