As the state environmental protection requirements become more and more strict, there are also relevant regulations and standards for boiler pollutant discharge. As a result, what is the sequential process of desulfurization and denitrification for the coal-fired boiler?
Whether the water quality in the gas-fired boiler reaches the required standards is directly related to the safety, performance and service life of boiler. The water must be treated before the boiler operation. However, what are the water quality standards for the gas-fired boiler?
In the boiler operation,the flue gas discharged from the flue gas duct has a certain temperature. However, the abnormal increase of flue gas temperature in boiler's flue gas duct is usually accompanied with other abnormal phenomena. In this regard, corresponding measures should be taken for adjustment based on the reason analysis.
With the continuous development of boiler manufacturing process and technology, fuel types of boiler have also increased, such as various combustible gases, fuel oil, biomass, coal and so on.
1) Set up the air preheater. One of the most effective measures to improve the thermal efficiency of thermal oil heater is to use an air preheater for heat recovery. 2) Use waste heat boiler for heat recovery. The waste heat boiler uses the waste heat in the flue gas exhausted from the thermal oil heater to heat water or generate steam.
The exhaust gas heat loss of coal-fired boiler is caused by the flue gas removed by final stage heat exchanger. The flue gas will take away a part of heat, mainly including the heat taken away by dry flue gas and the sensible heat with water vapor in the flue gas. What’s more, if the combustible gas in the coal-fired boiler is not completely burned, there will be heat loss as well. Therefore, this kind of heat loss mainly depends on the content of incomplete combustion products in the exhaust smoke.
Once the flameout of gas-fired or oil-fired boiler is confirmed, the boiler should be shut down for inspection and maintenance in time according to the operating regulations. Only after the inspection and test are completed, the boiler can continue to be used.