For thermal oil heater, what shall be checked before degassing and dehydration?
Before degassing and dehydration, boiler parts must be checked, and detailed inspection items are as follows:
1.Burners work well, combustion is stable and combustion load change can be controlled freely.
2.Auxiliary such as FD fan, ID fan, oil system equipment and so on shall do cold test and run normally.
3.Lubricating oil shall be full filled in all bearing boxes and oil cups.
4.Inspection of safety accessories and protective equipment:
a) The needle valve or the stop valve in the pressure gauge liquid saving pipe bend of front end is fully opened and precision, range and dial of pressure gauge meet the requirements. If there is no pressure, pointer is back to zero.
b) The liquid discharging pipe of liquid level gauge is in the closed state and the liquid discharging pipe is connected with the oil storage tank.
c) Lower stop valve of safety valve has been opened.
d) The thermometer and the automatic recording instrument have been calibrated and qualified. The over-temperature and overpressure alarm automatic protection device has been put into use and no abnormal phenomenon is in the unction of electric control panel.
-
YQ(Y)W series gas-fired/oil-fired horizontal thermal oil heaterLive Chat1400-14000 kW0.8-1.0 MPa
-
YLW series coal-fired thermal oil heaterLive Chat2800-29200 kW0.8-1.0 MPa
-
YQ(Y)L series gas-fired/oil-fired thermal oil heaterLive Chat7000-29200 kW0.8-1.0 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
As the 2026 FIFA World Cup brings the United States, Mexico and Canada into the international spotlight, attention is once again turning to the cities, industries and communities across North America. Away from the stadiums, manufacturing plants, beverage production lines and automotive component facilities continue their daily operations, providing steady support for local economies. ZOZEN Boiler’s WNS Series Serving Industrial Projects in North America In these less visible parts of ...14 Jul 2026 -
At the production site of a pharmaceutical company in Shanghai, a ZOZEN gas-fired steam boiler commissioned in 2010 has been operating steadily for 16 years. For this established pharmaceutical company, founded in 1995, the steam system is closely related to production rhythm, process coordination, and on-site operation support. Whether the equipment can maintain stable operation over the long term directly affects the continuity of daily production. Time is a practical test, and the continuous ...07 Jul 2026 -
As the beer industry moves toward greener, more continuous, and more refined production, the steam system has become an important part of brewing operations. Recently, the cooperation case between ZOZEN Boiler and Yanjing Beer (Guilin Liquan) Co., Ltd. once again highlighted the essential role and system value of industrial boiler equipment in the food and beverage industry. Industrial Heat and Beer Brewing Are Closely Connected From a Drop of Beer, the Value of Stable Steam Becomes ClearYan...24 Jun 2026











