zozen boiler
Home Service FAQs FAQ of thermal oil heater For thermal oil heater, what shall be checked before degassing and dehydration?

For thermal oil heater, what shall be checked before degassing and dehydration?

09 Dec 2022

Before degassing and dehydration, boiler parts must be checked, and detailed inspection items are as follows:

1.Burners work well, combustion is stable and combustion load change can be controlled freely.

2.Auxiliary such as FD fan, ID fan, oil system equipment and so on shall do cold test and run normally.

3.Lubricating oil shall be full filled in all bearing boxes and oil cups.

4.Inspection of safety accessories and protective equipment:

a) The needle valve or the stop valve in the pressure gauge liquid saving pipe bend of front end is fully opened and precision, range and dial of pressure gauge meet the requirements. If there is no pressure, pointer is back to zero.

b) The liquid discharging pipe of liquid level gauge is in the closed state and the liquid discharging pipe is connected with the oil storage tank.

c) Lower stop valve of safety valve has been opened.

d) The thermometer and the automatic recording instrument have been calibrated and qualified. The over-temperature and overpressure alarm automatic protection device has been put into use and no abnormal phenomenon is in the unction of electric control panel.

Related FAQs View More
Related news View More
  • Steam Runs Through the Brewing Process: ZOZEN Boiler Supports the Baijiu Industry
    Baijiu production is a continuous process. From grain steaming and fermentation to distillation, sterilization, and fermented-grain residue handling, many stages require a stable steam supply. As baijiu producers expand their operations, boiler systems need to provide sufficient steam while also adapting to different fuel conditions, changing loads, and environmental management requirements. In recent years, ZOZEN Boiler has developed steam boiler and auxiliary system solutions for baijiu produ...
    11 Aug 2026
  • A 10 TPH Boiler Delivered in 40 Days: The “ZOZEN Speed” Behind Yanjing Beer’s Letter of Appreciation
    Recently, Wuxi Zozen Boilers Co., Ltd. received a letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. In the letter, the customer expressed appreciation for ZOZEN Boiler’s responsiveness, coordination, and delivery support throughout the project. The customer also noted that ZOZEN helped resolve issues related to scheme adjustments, equipment access, and the delivery schedule. Letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. The letter was related to ...
    04 Aug 2026
  • ZOZEN Boiler Continues to Deepen 6S Management: From Workplace Standards to Manufacturing Coordination
    In industrial boiler manufacturing, the condition of materials, the organization of work areas, coordination between production processes, and safety requirements all affect the stability of manufacturing operations. As a boiler manufacturer, ZOZEN Boiler continues to promote 6S management by integrating Seiri, Seiton, Seiso, Seiketsu, Shitsuke, and Safety into daily workshop operations. The company is extending 6S management from workplace improvement to material control, process coordination, ...
    28 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity