zozen boiler
HomeBoiler tags1.2MW a oil boiler

“1.2MW a oil boiler”- related products

  • SZS series gas-fired (oil-fired) steam boiler 2020-09-06
    SZS series boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left, super heater is arranged at convection tube bundle. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane wall. Furnace and tube bundle is totally separated by the membrane wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.
  • SZS series gas-fired (oil-fired) hot water boiler 2019-03-28
    SZS series boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane water cooling tube wall. Furnace and tube bundle is totally separated by the membrane water wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.
  • YQ(Y)W series gas-fired/oil-fired horizontal thermal oil heater 2018-07-02
    The YQW series oil/gas thermal oil boiler adopts a two or three passes round coil structure. The end of the coil tube is tapered, effectively protecting the end furnace wall of the boiler. It is equipped with advanced combustion equipment, and the operation of the boiler is fully automated. The boiler is shipped as a whole and can be put into operation just by connecting the gas (oil) and electricity after it is in place on the site.
  • YQ(Y)L series gas-fired/oil-fired thermal oil heater 2018-07-02
    The YQL series oil/gas thermal oil boiler adopts a two-pass round coil structure. The end of the coil tube is tapered, effectively protecting the end furnace wall of the boiler. It is equipped with advanced combustion equipment, and the operation of the boiler is fully automated. The boiler is shipped as a whole and can be put into operation just by connecting the gas (oil) and electricity after it is in place on the site.
  • YLW series coal-fired thermal oil heater 2018-07-02
    The YLW series thermal oil heater, with its horizontal layout and square coil tube design, uses a chain grate system for efficient fuel combustion. It incorporates mechanical features for solid fuel feeding, ventilation, and slag removal. During operation, fuel undergoes radiation and convection heat exchanges, proceeds to the waste heat boiler, and subsequently moves to the air preheater and dust remover. The remaining flue gas is then expelled into the atmosphere, resulting in optimal heat transfer and efficient industrial heating.
  • RYQ series molten salt heater 2018-07-02
    ZOZEN's molten salt heaters utilize a heat medium of molten potassium nitrate and sodium nitrite. The heater elevates the molten salt beyond its melting point, enabling a circulation pump to propel it into a flowing and recyclable system. This medium is then further heated within the heat carrier furnace for continuous use. It typically operates between 400-550℃, with a maximum of up to 600℃.