“50MW power plant boiler”- related faq

  • How to use the gas-fired hot water boiler safely and what are the maintenance methods? 2020-10-16
    There are many applications of hot water boilers. With the environmental protection requirements become stricter, the hot water boilers are mostly gas-fired. Therefore, it is important to know how to use the gas-fired hot water boilers safely and what are the maintenance methods.
  • How to select the steam boiler used for the packaging plant? 2020-09-25
    The steam boiler in the packaging plant is mainly used in the heating process before the raw paper is made into cardboard. In brief, it is using steam which contains no water in the drying process to improve the production efficiency and product quality of packaging cartons. As a result, it has high requirements for the steam and steam boiler, such as temperature, water content, rated evaporation capacity per unit time, etc., which are important parameters in the boiler selection.
  • What are the water quality standards for the gas-fired boiler? 2020-09-18
    Whether the water quality in the gas-fired boiler reaches the required standards is directly related to the safety, performance and service life of boiler. The water must be treated before the boiler operation. However, what are the water quality standards for the gas-fired boiler?
  • How to effectively improve the thermal efficiency of thermal oil heater? 2020-09-04
    1) Set up the air preheater. One of the most effective measures to improve the thermal efficiency of thermal oil heater is to use an air preheater for heat recovery. 2) Use waste heat boiler for heat recovery. The waste heat boiler uses the waste heat in the flue gas exhausted from the thermal oil heater to heat water or generate steam.
  • How to control the water content and calorific value in the combustion process of oil-fired boiler? 2020-08-07
    There are many skill indicators involved in the operation of oil-fired boiler, some of which are variables. We must master the relationship between variables and working effect of oil-fired boiler to realize better regulation.
  • What is the difference between gas-fired boiler and condensing gas-fired boiler in working principle? 2020-07-10
    In general, gas-fired boiler uses natural gas to heat water in order to provide heat source for underfloor heating and heating radiator, while condensing gas-fired uses condensation technology to recycle the thermal energy from the exhaust gas.
  • What are the safety precautions when operating a gas-fired boiler burner? 2020-07-03
    1. During the start-up process of the burner, if the burner repeatedly alarms and locks, it should be found out the reason, find the fault and eliminate it, and then press the reset button to inherit the start. Note: The continuous press of the reset button should not exceed 10 seconds 2. If the burner is not successful in one combustion, the natural gas boiler induced draft fan should be restarted, and the second combustion can be started after 5 minutes of ventilation. 3. In the normal operation era, the burner close to the thermal equipment department (such as the connecting flange, etc.) will be very hot, to prevent the formation of burns. Do not place flammable materials in the vicinity to avoid causing fire. 4. During the operation of natural gas-fired boilers, it is necessary to closely supervise the working conditions of hot water circulation pumps and natural gas-fired boiler pressures, natural gas distribution bags, pipeline valves, pressure gauges, flow meters, and water
  • What are the discharge methods for industrial boilers? 2020-06-26
    Industrial boilers will produce wastes that needs to be treated during the use process, which is what we mentioned of boiler blowdown. What are the methods for boiler blowdown? 1. Regular blowdown 1) The time interval and quantity of discharge depend on the test results of boiler water. It usually do not exceed 5% of the water supply. 2) When the regular blowdown is being made under high load of the boiler, the blowdown of the water-cooled wall header is generally not required to avoid affecting the normal water circulation of the water-cooled wall and forming a tube explosion incident. 2. Continuous blowdown The amount of blowdown shall be determined according to the test results of the boiler water, and shall be completed by adjusting the needle-shaped angle of the blowdown tube.