The customer company makes full use of the local rich resources of coal, electricity, industrial salt, limestone to build chloralkali engineering project. Steam is an important energy resource in chlor-alkali enterprises. The stable output of steam and temperature have great influence on the quality of chlor-alkali products. Therefore, the customer puts forward higher requirements for the steam output and temperature of the boiler.
The production line of autoclaved aerated concrete products of Guangxi Lulin Building Materials Technology Co., Ltd. mainly produces new energy-saving materials for wall, with a total investment of 17 million dollars, which will be constructed in two phases.
Yili Group, the largest dairy company in China, invested in a Green Production and Intelligent Manufacturing Demonstration and Application Project in Wuwei, Gansu Province. The total investment of the project is about 2.1 billion yuan (about 327 million dollars). Ten production lines have been built in the first phase. After completion, the production base will have a liquid milk production capacity of 603 tons/day (with an annual output of 180,900 tons), with an annual output value exceeding 1 billion yuan (156 million dollars). The steam boiler purchased in this project is mainly to meet the demand of production heat and heat supply in winter.
Yunnan Phosphate Group Co., Ltd. is a wholly-owned subsidiary of Yunnan Yuntianhua Co., Ltd., and its main business scope is geological exploration, phosphate mining and phosphating. In order to cope with the increasingly fierce market competition, Yuntianhua Group, the headquarters, carried out a pilot-scale technology development project with an annual output of 1,500 tons of 2,4- difluorobenzene and p-fluoronitrobenzene in Jinning Industrial Park, Kunming City, Yunnan Province.
Steam is necessary for general large-scale hospitals, and there is a great demand. Medical devices need steam for high-temperature sterilization; There are a lot of bed sheets and hospital clothes in the inpatient department every day, which need steam for cleaning, disinfection and drying; Hospital canteens need steam and hot water for cooking, cleaning and disinfection; In addition to heating in winter and supplying hot water, all these need strong support from steam boilers.
Customer company invested 540 million yuan (US 83.4 million dollars) to build a dairy processing plant. The project planed to build a full-automatic intelligent UHT milk and milk powder production workshop, with an estimated annual output of 180000 tons of dairy products.
Nowadays, most of the newly built high-speed railway stations in China have large and open spaces such as waiting halls and ticket selling halls, and large areas of glass curtain walls or glass roofs. This large area of space puts forward new requirements for station heat energy supply. In addition, with the country's higher requirements for energy conservation and emission reduction in recent years, various places have also launched environmental protection transformation schemes for heating equipment. Therefore, the transformation of heating equipment in stations must be enforced.
The distributed energy system project built by the customer company provided electric energy and heat energy for the surrounding enterprises through the cogeneration unit of gas-steam combined cycle.