What are the installation requirements for the circulating pump of the thermal oil heater?
The installation requirements for the circulating pump of the thermal oil heater
1) Quantity. The circulating system should include at least two sets of heat oil circulating pumps. On is a working pump and the other is a standby pump.
2) Head. The rate of flow and head of the circulating pump must ensure the flow velocity of heat medium oil in the thermal oil heater. The flow velocity on the radiation heating surface should not be less than 2 meters per second, and the flow velocity on the convention heating surface should not be less than 1.5 meters per second.
3) Power. There should be a backup power supply or other equipment in the boiler room to ensure the normal operation of the circulating pump in the event of a power failure.
4) Filter. The filter should be installed at the inlet of the circulating pump and should be cleaned regularly.
5) Filling pump. The appearance, installation size and basic conditions of the filling pump should refer to the product documents and installation instructions.
-
YQ(Y)W series gas-fired/oil-fired horizontal thermal oil heaterLive Chat1400-14000 kW0.8-1.0 MPa
-
YQ(Y)L series gas-fired/oil-fired thermal oil heaterLive Chat7000-29000 kW0.8-1.0 MPa
-
YLW series coal-fired thermal oil heaterLive Chat1400-29000 kW0.8-1.0 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat
-
On the thriving industrial land of Shandong, the continuous demand for thermal energy supply from enterprises drives the transformation of the boiler industry. With profound technical expertise and ongoing innovation, ZOZEN Boiler remains at the forefront of providing high-quality, adaptable boiler models for various industries. ZOZEN Boiler Provides Tailored Boiler Solutions for Shandong Industries Looking back, the cooperation projects with Shandong Luhua Group and Shandong...29 Jul 2025
-
In the industrial zone of Wen’an County, Xinghua Cable Co., Ltd. is making steady progress on its project with an annual production capacity of 11 million meters of wires, cables, and accessories, backed by an investment of RMB 520 million. Upon completion, the project is expected to create over 150 jobs and generate annual sales revenue of RMB 800 million, demonstrating promising prospects. As a key supplier of thermal energy equipment, ZOZEN Boiler is quietly supporting the development o...22 Jul 2025
-
On March 20, 2025, the Guizhou Jinyuan Zhijin “Replacing Small Units with Large Ones” Relocation Project (2×660 MW), under State Power Investment Corporation, successfully achieved the first ignition of its boiler. This project replaced traditional oil-fired ignition fuel with liquefied natural gas (LNG), setting a new precedent for employing clean energy in 660 MW ultra-supercritical “W” flame boilers. As a key equipment supplier for this project, ZOZEN Boiler prov...15 Jul 2025