The manufacture of aerated concrete products relies on the autoclaved curing process to improve the performance of concrete, so that it is not affected by the temperature and humidity of the external environment. Therefore, in this process link, the quality of steam boiler affects the quality of concrete products to a certain extent. The customer ordered two sets of WNS series three-pass gas-fired steam boiler from ZOZEN Boiler.
Efor Inc. was founded in 1998 in Ankara, Turkey. It is a well-known local construction company. Efor has undertaken a local power generation project in Turkey and needs to purchase a set of biomass-fired steam boiler in the project.
Luxcaseict mainly produces and sells metal structural parts for 3C products such as computers, communications and consumer electronics.
The company built a new production plant with an area of 850,000 square meters. According to the demand of heat for production and living, LUXCASEICT purchased a batch of gas-fired steam and hot water boilers from ZOZEN Boiler.
Tangshan Shengda Paper Co., Ltd. was established in 2002. It is a professional production company of corrugated paper. In the production process of paper, the drying process needs a lot of steam, therefore, the customer company ordered a set of SZS series gas steam boiler from ZOZEN Boiler.
The client company mainly provides steam central heating for several enterprises in the industrial park. With the continuous construction of the industrial park, enterprises have a huge demand for heat. The customer company ordered a set of SZS series gas-fired steam boiler from ZOZEN Boiler to meet the heating demand in the park.
Customer would like to upgrade the coal-fired steam boiler in the plant, therefore, they introduced 3 sets of ZOZEN SZS series 29MW gas-fired hot water boilers.
The production, drying and curing of concrete need steam. According to the production technology of the customer, ZOZEN Boiler provided the WNS series gas-fired steam boiler.