Psychosis Prevention Center of Jining was established in 1952. It is a first-class psychiatric hospital integrating medical treatment, teaching, scientific research, judicial authentication, drug rehabilitation, occupational disease prevention and treatment, first aid and community health.
Customer company invested 540 million yuan (US 83.4 million dollars) to build a dairy processing plant. The project planed to build a full-automatic intelligent UHT milk and milk powder production workshop, with an estimated annual output of 180000 tons of dairy products.
It is an important strategic deployment put forward by the central government to promote clean heating in winter in northern China. Recently, a clean energy central heating project with a total investment of 20 million dollars has been built in Hebei province, China. The project rectifies the old equipment and plans to use 2 sets of gas-fired hot water boilers to provide central heating for local residents. The requirements of the boilers are as follows:
The client is a small and medium-sized garment textile plant. Steam boiler, as a key equipment of textile production line, is widely used in textile, sizing, printing and dyeing, weaving and other links.
High-temperature steam plays a key role in the taste and purity of wiune in the brewing process. Therefore, the customer needs a steam boiler that can output sufficient and stable steam with the temperature control system.
Nowadays, most of the newly built high-speed railway stations in China have large and open spaces such as waiting halls and ticket selling halls, and large areas of glass curtain walls or glass roofs. This large area of space puts forward new requirements for station heat energy supply. In addition, with the country's higher requirements for energy conservation and emission reduction in recent years, various places have also launched environmental protection transformation schemes for heating equipment. Therefore, the transformation of heating equipment in stations must be enforced.
The customer company is mainly engaged in the production and sales of auto tires. The customer company wishes to convert the coal-fired boiler to natural-gas-fired boiler through technical transformation, eliminate the demand of coal.
Tiexi plant of BBA plans to realize digital and sustainable development. At the same time, considering that some process links of automobile manufacturing require sufficient heat source and constant temperature environment, Tiexi plant of BBA decided to purchase high-efficiency and energy-saving gas-fired hot water boilers through public bidding. With the advantages of high-efficiency, energy-saving and environment-friendly, ZOZEN WNS series gas-fired hot water boiler won the bid for the boiler procurement and installation of the project.