ZOZEN ZZ series water tube steam boiler adopts the "D" type structure. The furnace is on the right side and the convection tube bundle is on the left. Around the furnace is the membrane water wall. The boiler is equipped with an advanced burner, an economizer and a condenser, which can improve the thermal efficiency to more than 98% and reduce the NOx emission to less than 30mg/Nm³. With an automatic control system, the boiler can achieve unattended operation.
SZS series boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left, super heater is arranged at convection tube bundle. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane wall. Furnace and tube bundle is totally separated by the membrane wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.
SZS series boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane water cooling
tube wall. Furnace and tube bundle is totally separated by the membrane water wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.
WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.
CFBC technology is a new, efficient, and low-pollution clean coal method. This low-temperature combustion significantly reduces Nitrogen Oxide emissions and enables direct, high-efficiency desulfurization. Economically straightforward, CFBC lowers costs compared to other methods and accommodates various fuels, including low-calorific, low-quality coal. The resulting ash is reusable, eliminating secondary pollution. Moreover, CFBC supports wide load adjustments, operating down to about 30% of full load.
CFBC technology is a new, efficient, and low-pollution clean coal method. This low-temperature combustion significantly reduces Nitrogen Oxide emissions and enables direct, high-efficiency desulfurization. Economically straightforward, CFBC lowers costs compared to other methods and accommodates various fuels, including low-calorific, low-quality coal. The resulting ash is reusable, eliminating secondary pollution. Moreover, CFBC supports wide load adjustments, operating down to about 30% of full load.
The YQW series oil/gas thermal oil boiler adopts a two or three passes round coil structure. The end of the coil tube is tapered, effectively protecting the end furnace wall of the boiler. It is equipped with advanced combustion equipment, and the operation of the boiler is fully automated. The boiler is shipped as a whole and can be put into operation just by connecting the gas (oil) and electricity after it is in place on the site.
The YQL series oil/gas thermal oil boiler adopts a two-pass round coil structure. The end of the coil tube is tapered, effectively protecting the end furnace wall of the boiler. It is equipped with advanced combustion equipment, and the operation of the boiler is fully automated. The boiler is shipped as a whole and can be put into operation just by connecting the gas (oil) and electricity after it is in place on the site.