zozen boiler
Home Service FAQs Boiler basics What are the components of the boiler piping system?

What are the components of the boiler piping system?

03 Sep 2021

The installation contents of boiler body pipeline are as follows:

1) Connection between water supply console and economizer header;

2) Connection between economizer and inlet pipe from economizer outlet to drum;

3) Connection between the main pipe and branch pipe of the drum drop and each lower header of the water wall;

4) Connection of steam guide pipe between each water wall header and steam drum;

5) Connection of superheated steam pipe between outlet header of low-temperature superheater and intermediate header of desuperheater and high-temperature superheater.

6) Installation of valves and supports in the boiler body pipeline.

Related FAQs View More
Related news View More
  • ZOZEN Boiler’s Drouble Drum Biomass Boiler Debuts with a Renewed Exterior
    When an industrial boiler arrives on site, what first catches a customer’s attention is often not the specification sheet, but the overall appearance of the equipment in the plant environment. For boiler equipment, exterior design is not only about visual presentation; it also reflects the manufacturer’s approach to product details, on-site management, and brand image. ZOZEN Boiler has upgraded the exterior of its SZL series biomass boiler, presenting a more unified visual design and...
    19 May 2026
  • ZOZEN Boiler Concludes Its Participation at PALMEX JAKARTA 2026
    From May 6 to 7, 2026, PALMEX JAKARTA 2026, the International Palm Oil Industry Equipment Exhibition, was held at JIEXPO in Jakarta, Indonesia. At booths 190 & 192, ZOZEN Boiler presented its boiler products and thermal energy solutions for industries such as palm oil processing. During the two-day exhibition, ZOZEN welcomed multiple groups of visitors, including existing clients and new prospects. Some new visitors returned to the booth several times for further discussions, and the overall...
    12 May 2026
  • ZOZEN Expands in Ecuador’s Paper Industry with Heavy Oil Steam Boiler Project
    ZOZEN Boiler has recently shipped a 10-ton WNS series heavy oil steam boiler to Ecuador, where it will support the production line of a local corrugated board packaging company. The project marks another step in ZOZEN’s expansion in Ecuador’s paper industry and reflects growing demand in South America for reliable steam supply, fuel adaptability, and after-sales support. ZOZEN WNS series heavy oil condensing steam boiler Stable steam supply matters in paper productionIn paper and...
    05 May 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity