I. Project Background:
Jade Palace Hotel is a five-star business hotel with guest rooms, dining, entertainment, shopping and office buildings. Hotel hot water system usually adopts centralized hot water supply system, that is, one or more heating devices deliver hot water to each room through hot water pipe network. This time, Jade Palace Hotel ordered several sets of hot water boilers from ZOZEN Boiler.
II. Solutions:
ZOZEN Boiler has rich experience in hotel industry. According...
The customer is a large-scale cross-regional and cross-industry design group, and it has undertaken the local key livelihood project-coal-to-natural-gas transformation project. In this project, the heat source station is reformed, the pulverized coal boiler with heavy pollution and backward technology is eliminated, and the clean and efficient gas-fired hot water boiler is selected as the core heating equipment.
The SZS series is double drum water tube boiler, with the large furnace design, it can ensure the sufficient combustion of the fuel. The combustion chamber of the boiler adopts the water cooling wall structure, which enhances the efficient radiation heating area and improves the thermal efficiency of the boiler
There are several kinds of function areas in school, such as the teaching area, bath area, canteen and dormitory, each area has different requirements on the hot water temperature. This time, Guyuan No. 8 Middle School ordered two sets of WNS series hot water boilers from ZOZEN Boiler.
Customer would like to upgrade the coal-fired steam boiler in the plant, therefore, they introduced 3 sets of ZOZEN SZS series 29MW gas-fired hot water boilers.
The heat supply station plays an important role in local area, it provides the heating for over 75% of local residents in winter. Therefore, the station puts forward strict requirements on the heating boiler.
It is an important strategic deployment put forward by the central government to promote clean heating in winter in northern China. Recently, a clean energy central heating project with a total investment of 20 million dollars has been built in Hebei province, China. The project rectifies the old equipment and plans to use 2 sets of gas-fired hot water boilers to provide central heating for local residents. The requirements of the boilers are as follows:
The customer project is located in Hainan Province with a total investment of 28 million US dollars in the first phase. After the project is completed, the biomass resources of Yangpu and surrounding cities and counties will be fully used to realize the resource utilization of renewable energy, and the heating steam will be provided for the enterprises in and around the development zone to meet the production needs of relevant enterprises. As the gas-fired boiler supplier of this project, ZOZEN boiler provided a set of gas-fired superheated steam condensing boiler with capacity of 50 tph.